Case Studies
- Light refurbishment Truro, Cornwall.
- Single storey extension & alteration work, Falmouth, Cornwall.
- Conservatory & alteration work, Redruth, Cornwall.
- Master bedroom alteration work and ensuite installation, Flushing, Cornwall.
- Bungalow refurbishment, Tintagel, Cornwall.
- Three traditional new build houses, Black Rock, Cornwall.
- Traditional new build bungalow, Stithians, Cornwall.
- Timber frame extension, Ponsanooth, Cornwall.
- Six traditional new build houses, Lostwithiel, Cornwall.
- Three traditional new build houses, Carbis Bay, Cornwall.
- New extension and alteration work Flushing, Cornwall.
- Traditional New Build House, St Just In Roseland, Cornwall.
- Loft conversion, two storey extension & alteration work Perranwell Station, Cornwall.
- New water main under St Just Creek near Messack Point, Cornwall.
- Demolition of old outbuildings and building new, Falmouth, Cornwall.
- Alteration work, Truro, Cornwall.
- Small bathroom refit, Truro, Cornwall.
- Five Bedroom Traditional New Build, Kehelland, Cornwall.
- Four Bedroom Traditional New Build, Camborne, Cornwall.
- New extension and refurbishment work, Twickenham, London.
- Small projects
- Timber framed window replacement and repairs, listed house, Tehidy, Cornwall.
- Two Bedroom Barn Conversion, Helston, Cornwall.
- Seven 3 bedroom, traditional new build dormer bungalows, Truro, Cornwall.
New extension and refurbishment work, Twickenham, London.
A new oak clad and hand made brick extension with lead roof covering.
Kewar Construction carried this project out working with KPK Builders who we have worked with a lot over the last 10 years. This project was carried out in a testing timescale and difficult conditions due to its location.
There was no access to the rear of this property so we had to take the excavator through the customers house and all reduce dig material plus all imported materials had to also go through the customers house.
We were working miles from home and had to work with people and suppliers we had no relationships with, we carried out the project to a very high standard and a testing timescale. We were very fortunate to have had good help and built some good relationships.